1. Refractory Cement (Aluminate Cement )
Aluminate cement is produced by bauxite and limestone. The raw materials are calcined in rotary klin and grinding the clinker, and the content of Al2O3 is 50-60%. 
| Items | 
Unit | 
CA-50-G5 | 
CA-50-G6 | 
CA-50-G7 | 
CA-50-G9 | 
| Al2O3 | 
% | 
50.00 min | 
50.00 min | 
50.00 min | 
51.00 min | 
| CaO | 
% | 
33.00 min | 
33.00 min  | 
33.00 min  | 
33.00 min  | 
| SiO2 | 
% | 
9.00 max | 
9.00 max | 
9.00 max | 
8.00 max | 
| Fe2O3 | 
% | 
3.00 max | 
3.00 max | 
3.00 max | 
3.00 max | 
| TiO2 | 
% | 
3.00 max | 
3.00 max | 
3.00 max | 
3.00 max | 
| Specific Surface Area | 
cm2/g | 
3000 min | 
3000 min | 
3000 min | 
4000 min | 
| Beginning Set | 
min | 
30 min | 
30 min | 
30 min | 
90 min | 
| Ending Set | 
hour | 
6 max | 
6 max | 
6 max | 
6 max | 
| Bending Strength (1 day) | 
Mpa | 
5.50 min | 
6.00 min | 
7.00 min | 
8.50 min | 
| (3 day) | 
Mpa | 
6.50 min | 
7.00 min | 
8.00 min | 
10.00 min | 
| Compressive Strength (1 day) | 
Mpa | 
40.00 min | 
45.00 min | 
50.00 min | 
70.00 min | 
| (3 day) | 
Mpa | 
50.00 min | 
55.00 min | 
60.00 min | 
80.00 min | 
Packing: 25Kgs bag in 1MT big bag or in 1MT big bag 
2. Refractory Cement (High Aluminate Cement )
CA-70 or CA-80 is a pure calcium aluminate cement with alumina content of approx 70% or 80%. Firstly the clinker is produced by melting selected industrial aluminium oxide and fine limestone under strict mineralogical control in rotary kilns. After cooling, the surface area is approx 6000cm2/g or 7000 cm2/g after crushed by ball mills.
| Items | 
Unit | 
CA-70 | 
CA-80 | 
| Al2O3 | 
% | 
68.5-71.5 | 
78.5-81.0 | 
| CaO | 
% | 
26.5-30.5 | 
17.0-20.0 | 
| SiO2 | 
% | 
0.50 max | 
0.50 max | 
| Fe2O3 | 
% | 
0.50 max | 
0.50 max | 
| K2O+Na2O | 
 % | 
-- | 
-- | 
| Specific Surface Area | 
cm2/g  | 
5500 min | 
7000 min | 
| Beginning Set | 
min | 
45 min | 
15 min | 
| Ending Set | 
hours | 
6 max  | 
6 max | 
| Bending Strength  (24h) | 
Mpa | 
5.0 min | 
4.0 min | 
| Compressive Strength  (24h)   | 
Mpa | 
40.0 min | 
35.0 min | 
Packing: 25Kgs bag in 1MT big bag or in 1MT big bag